Sign In | Join Free | My portofva.com
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > Crawler Crane >

Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency

Product Categories
Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency

Brand Name : XCMG

Model Number : XGC350

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Average Ground Pressure : 0.059Mpa

Technique : Casting

Used Crane : lattice boom crawler crane

Boom Type : Automatic 4 sections

Color : Yellow

Origin : 100% China

Condition : excellent working condition

Lifting Capacity : 350 TON

Contact Now

Used 350T Crawler Crane Lifting Equipment To Improve Work Efficiency


XGC350t Crawler Crane Technical Specifications


Crawler crane models: XGC350
Max rated lifting capacity: 350t
Max lifting moment: 2400t.m


Typical working conditions


Light main boom working condition


Lightweight boom working condition_ Characteristics of lightweight boom hook without boom end pulley (LB/1)

Lightweight boom working condition_Working range of lightweight boom main hook without boom end pulley (LB/1)

Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency

Lightweight main boom working condition_working range diagram of main hook of lightweight main boom without arm end pulley (LB/1)


Lightweight boom working condition_no boom end pulley LB/1_130t+50t lightweight boom main hook performance

LB/1

Lightweight main boom length (m)

Radians

73.5*

79.5*

85.5*

91.5*

97.5*

103.5**

109.5**

115.5**

(m)

t

t

t

t

t

t

t

t

9

100.0








10

98.5

96.8

90.0






11

95.0

93.3

89.0

73.6

65.7




12

92.6

91.8

88.4

72.2

65.1

56.4

47.9


13

90.1

89.6

87.0

70.9

64.5

55.9

47.5

40.6

14

88.2

88.1

86.1

69.7

63.8

55.4

47.1

40.2

16

84.4

85.0

83.9

67.2

62.5

54.2

46.2

39.4

18

80.2

82.0

81.7

65.0

61.3

52.4

45.2

38.6

20

76.5

77.9

75.5

62.7

59.9

50.6

44.3

37.8

22

72.7

70.4

68.2

60.7

58.7

49.0

43.1

36.9

24

65.5

64.1

62.0

58.7

57.5

47.4

41.7

36.1

26

58.6

58.1

56.7

55.2

53.5

45.9

40.5

35.3

28

52.9

52.4

51.6

50.7

49.2

44.4

39.3

34.3

30

48.0

47.5

46.8

46.4

45.3

44.0

38.1

33.3

32

43.9

43.3

42.5

42.2

41.7

40.9

37.1

32.3

34

40.3

39.6

38.9

38.6

38.0

37.8

36.0

31.5

36

36.7

36.5

35.8

35.4

34.9

34.6

34.2

30.5

38

33.9

33.3

32.9

32.6

32.0

31.7

31.3

29.7

40

31.5

30.9

30.1

30.0

29.5

29.2

28.8

28.5

42

29.3

28.7

27.9

27.6

27.2

26.9

26.5

26.2

44

27.3

26.7

25.9

25.5

25.0

24.9

24.4

24.2

48

23.4

23.2

22.4

22.0

21.5

21.2

20.9

20.6

52

20.6

20.0

19.6

19.2

18.6

18.2

17.8

17.7

56

18.2

17.6

16.9

16.7

16.1

15.8

15.4

15.1

60

16.1

15.5

14.7

14.3

14.0

13.7

13.2

12.9

64

14.2

13.6

12.9

12.5

12.0

11.9

11.4

11.1

70


11.3

10.6

10.2

9.7

9.4

9.0

8.7

74



9.3

8.9

8.4

8.1

7.6

7.4

76



8.7

8.3

7.8

7.5

7.0

6.8

80




7.2

6.6

6.4

5.9

5.6

86





5.2

4.7

4.3

4.0

92







3.1

2.8

94







2.7


Notes:
1. The actual load must be deducted from the values ​​in the table by the weight of the hook, sling and wire rope wrapped around the hook and the boom head.
2. The "*" light main boom combination requires a 1.27m waist rope. The "**" light main boom combination requires 1.27m and 2.61m waist ropes.
3. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be installed at the main boom reducer.


Lightweight boom working condition_no boom end pulley LB/1_135t+50t lightweight boom main hook performance (optional)

LB/1

Lightweight main boom length (m)

Radians

73.5*

79.5*

85.5*

91.5*

97.5*

103.5**

109.5**

115.5**

(m)

t

t

t

t

t

t

t

t

9

100.0








10

99.0

97.5

92.0






11

96.0

94.3

90.1

75.0

68.0




12

94.0

92.6

89.2

73.4

66.1

58.0

49.0


13

92.0

91.0

88.3

72.0

65.4

56.8

48.3

42.0

14

88.6

89.4

87.5

70.7

64.8

56.2

47.8

40.8

16

84.8

85.4

84.3

68.2

63.5

55.0

46.9

40.0

18

80.6

82.4

82.1

65.3

61.6

52.6

45.4

38.8

20

76.9

79.5

78.0

63.0

60.2

50.9

44.5

38.0

22

73.4

72.9

70.5

60.9

59.0

49.2

43.3

37.1

24

67.7

66.4

64.2

59.0

57.8

47.6

41.9

36.3

26

60.6

60.1

58.8

57.1

55.5

46.1

40.7

35.5

28

54.8

54.2

53.5

52.6

51.1

44.6

39.5

34.4

30

49.8

49.2

48.5

48.0

47.1

44.2

38.3

33.5

32

45.4

44.9

44.2

43.8

43.3

42.0

37.2

32.4

34

41.7

41.2

40.5

40.0

39.5

39.2

36.2

31.6

36

37.9

37.9

37.1

36.7

36.2

35.9

35.2

30.7

38

35.1

34.4

34.2

33.8

33.3

33.0

32.6

29.8

40

32.6

32.0

31.2

31.3

30.7

30.4

30.0

29.1

42

30.2

29.6

28.9

28.5

28.4

28.1

27.7

27.4

44

28.2

27.6

26.9

26.4

25.9

26.0

25.6

25.3

48

24.3

24.1

23.3

23.0

22.3

22.0

21.9

21.6

52

21.4

20.8

20.3

20.0

19.4

19.1

18.7

18.6

56

18.9

18.3

17.6

17.4

16.8

16.5

16.1

15.8

60

16.8

16.2

15.5

15.0

14.7

14.4

13.9

13.6

64

14.9

14.3

13.5

13.1

12.6

12.5

12.1

11.8

70


11.9

11.2

10.8

10.2

10.0

9.6

9.3

74



9.8

9.4

8.9

8.6

8.2

8.0

76




8.5

8.0

7.7

7.3

7.1

80




7.7

7.1

6.8

6.4

6.1

86





5.6

5.3

4.8

4.5

92







3.5

3.2

94







3.1

2.8

Notes:
1. The actual load must be deducted from the values ​​in the table by the weight of the hook, sling and wire rope wrapped around the hook and the boom head.
2. The "*" light main boom combination requires a 1.27m waist rope. The "**" light main boom combination requires 1.27m and 2.61m waist ropes.
3. The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be installed at the main boom reducer.Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work EfficiencyUsed 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work EfficiencyUsed 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work EfficiencyUsed 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work EfficiencyUsed 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work EfficiencyUsed 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work EfficiencyUsed 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency


Product Tags:

350t lattice boom crawler crane

      

lattice boom crawler crane 2400t.m

      

used mini crawler crane

      
China Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency wholesale

Used 350T Lattice Boom Crawler Crane 2400t.M Lifting Equipment To Improve Work Efficiency Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)